The move was for 13 dismantled Cobras with an additional 1,000 cubic meters of loose cargo / crates. This included the mobilization of staff and lifting equipment at origin and operating in a very tight environment where lift boon cranes were used with only six inches to clear the door opening.
Global Shipping Services was on site for 10 days.
The very tight delivery schedule was met.